The short version
- The biggest myth in our industry is that once a website goes live, the enquiries roll in. They don’t.
- A website that nobody improves gets slowly worse, even when nobody touches it.
- Most teams improve their website in one of three ways, and none of them tells you anything.
- Before anything changes, we write down where you are now.
- Change everything at once and you’ll never know what worked.
- Four stages, each with something you can point to at the end.
If you’re asking for budget to keep improving a website that’s already live, someone will ask what they’re paying for. A redesign is easy to picture. A process isn’t.
So here’s the website optimisation process we run, week by week, written so you can forward it to whoever has to sign it off.
Why launch isn’t the finish line
The biggest myth in our industry is that once a website goes live, the enquiries roll in. They don’t.
Launch is when real buyers meet the site for the first time. It’s when you find out which pages they use, where they hesitate and where they leave.
But by then the agency has moved on, the budget is spent and your team is back on business as usual. Nobody is watching. A page gets added here, a service gets bolted on there, and the site drifts back towards the mess you replaced.
What it costs to leave it alone
A website that nobody improves gets slowly worse, even when nobody touches it.
What doesn’t work
Most teams improve their website in one of three ways, and none of them tells you anything.
“We’ll wait for the next redesign.” Five years of leaking enquiries, then a big bang that brings its own problems.
“We’ll fix things as people mention them.” You end up fixing what bothered the MD, not what’s stopping buyers.
“We’ll change a few things at once and see.” If enquiries go up, you won’t know which change did it. If they go down, you won’t know what to undo.
Baseline first
Before anything changes, we write down where you are now.
Enquiries a month and where they come from. Where people drop out on the key pages. Load times, mobile usability and what search is sending you. And the goals you’ve agreed, so everyone knows what success looks like.
Without a baseline, nothing can be shown to have worked, because there’s nothing to measure against. It’s the step most teams skip, and the one that makes the rest provable.
One change at a time
Change everything at once and you’ll never know what worked.
Changes go live in order, each one dated and written down with what it was meant to do. Evidence decides the order, not opinion, so the thing costing you most goes first.
B2B sites rarely have the traffic for split testing. So rather than wait months for a test to finish, we watch what happens on the key pages: recordings of real visitors, search data and the journeys people actually take. It’s slower to prove than a test result, and more honest about what’s going on.
The website optimisation process: what twelve weeks looks like
Four stages, each with something you can point to at the end.
- Kick-off (week 1). We audit the site, agree your goals and pick the quick wins worth doing first. You get a plan, and the pages to start with.
- Performance (weeks 2 to 5). SEO fixes, load times, security and mobile usability, so nothing technical is holding the site back. You get a better-performing site and a content plan for search.
- Conversion (weeks 6 to 9). UX and conversion changes on the key pages, with analytics set up so you can see what moves. You get fewer drop-off points and better-quality leads.
- Test and plan (weeks 10 to 12). We check every change did what it was meant to, document it and plan what comes next. You get proof of what worked, and a roadmap for after.
Changes go live as we go, so you see movement in week four, not at the end.
Why small changes add up
You don’t need more traffic to get more enquiries. You need more of the traffic you have.
Here’s an illustrative example, using the starting numbers from the calculator on our conversion page. Say a site gets 3,000 visits a month, 1% of visitors enquire, 20% of enquiries become customers and a customer is worth £5,000. That site brings in £360,000 a year.
Improve the enquiry rate by a quarter, from 1% to 1.25%, and it’s £450,000. That’s £90,000 more from the same traffic. These aren’t your numbers and they aren’t a promise. Put your own in and see what it looks like for your business.
How to report it
Report what the changes brought in, not what you did.
Lead with enquiries against the baseline, and what they turned into. Then the list of changes, each with what it moved. Then what’s left, including the things your team can do without us.
If you can’t yet follow an enquiry through to revenue, connected data and reporting joins the website to your CRM so you can. It’s also worth agreeing what counts as success before the work starts: stop moving the goalposts.
How we run it
Twelve weeks on the site you already have, measured from week one.
Our 12-week conversion programme is quoted per programme, once we’ve seen what you’ve got. If you’d rather start with the evidence, a UX audit from £550 + VAT tells you what to fix first.
Questions about the website optimisation process
Measure where the site is now, find where people drop out and why, then fix the most costly problems one change at a time, checking each one did what it was meant to. Ours runs over twelve weeks in four stages.
Twelve weeks is long enough to fix the main things and show what moved. Some changes move within weeks, because they go live as they’re ready rather than all at the end.
If the site’s bones are good, usually yes. It’s lower risk and you can prove what changed. If the structure is wrong, optimising won’t fix it, and we’ll say so. Here’s how to tell if you can fix your website without a redesign.
You get proof of what worked, a roadmap and the list of what’s left, including what your team can do without us.
Free resource
3 reasons your website isn’t converting. The three most common reasons visitors leave without getting in touch, and how to spot them on your own site.
The one thing to do next
Conversion optimisation
A baseline in week one, changes live as we go, and proof of what moved by week twelve. Quoted per programme.
